LogoHAUL

HAUL

Building Materials Freight · Port to Job Site

Performance Summary — FY 2025–26● LIVE
0
short tonsMoved This Fiscal Year
0.0
avg hrsCustoms Clearance Time
0.0%
on-timeDelivery Accuracy
0
trade lanesActive Coverage
0
categoriesMaterial Types Handled

Building materials don't wait. Neither do we.

REBAR COILS·TYPE III CEMENT·STRUCTURAL STEEL·PREFAB PANELS·WIRE MESH·PRECAST COLUMNS·AGGREGATE·METAL DECKING·HOLLOW-CORE SLABS·ANGLE IRON·REBAR COILS·TYPE III CEMENT·STRUCTURAL STEEL·PREFAB PANELS·WIRE MESH·PRECAST COLUMNS·AGGREGATE·METAL DECKING·HOLLOW-CORE SLABS·ANGLE IRON·

Overweight & Overdimensional Flatbed Routing

Structural steel · Rebar bundles · Precast panels · Metal decking

PERMITTED LOADS

Technical Parameters
ParameterSpecification
Max Payload48,000 lbs standard · 105,500 lbs with multi-axle permit
Deck Length48 ft / 53 ft / 80 ft extendable
Width Limit8 ft 6 in standard · 16 ft with escort
Height Clearance13 ft 6 in standard · 14 ft 6 in with low-boy
Permit Lead Time24–72 hrs (state-dependent)
Escort RequirementSingle escort >12 ft · Dual escort >14 ft 6 in
Transit Window1–6 business days (intrastate) · 3–10 days (interstate)
Coverage RegionCONUS · Cross-border CA/MX via bonded carrier
Load SecurementFMCSA §393.100 compliant · Chain/binder + dunnage
Certifications & Compliance
FMCSA RegisteredUSDOT 2847391OD Permit All 48CARB Compliant
Plain Language Summary

We run permitted overdimensional loads as a core service, not an exception. Our routing team files multi-state permit packages 72 hours ahead of dispatch, coordinates pilot car positioning, and pre-clears bridge weight ratings on every lane. For rebar coils, structural beams, and precast panels exceeding standard deck limits, we specify the exact trailer type — step deck, drop deck, or stretch RGN — based on your piece dimensions and delivery site constraints. No load leaves our yard without a confirmed weight ticket and signed bill of lading.

Operational Diagram
INTERSTATE ROUTE53 FT14.5 FTMAX PAYLOAD48,000 LBSOVER-DIMPERMIT REQ.PORT OF ENTRYWEIGH STATIONJOB SITEREV. 2026-02 · HAUL FREIGHT SYSTEMS · OD/FLATBED ROUTING DIAGRAM

Bonded Warehouse & Customs Brokerage

CBP Entry · ISF Filing · Duty Deferral · Segregated Storage

LICENSED BROKER

Technical Parameters
ParameterSpecification
Broker LicenseCBP License #12-34891 · All U.S. Ports of Entry
Bond Coverage$10M Continuous Bond · Single-Entry available
ISF Filing24 hrs pre-vessel departure (10+2 compliant)
Entry TypesType 01 (Consumption) · Type 06 (FTZ) · Type 23 (TIB)
Avg Clearance Time18.4 hrs (ACE automated) · 72 hrs (exam)
Bonded StorageUp to 5 years duty-deferral · Segregated bays by material
Capacity180,000 sq ft bonded · Forklift capacity 60,000 lbs
Compliance FilingsEPA 3520-1 · FWS · CPSC · USDA as applicable
Transit WindowSame-day release (pre-filed) · 1–3 days (exam lanes)
Certifications & Compliance
CBP Licensed BrokerC-TPAT PartnerFTZ OperatorISF 10+2AD/CVD Certified
Plain Language Summary

We file your ISF before the vessel departs and your entry summary before the container hits the dock. For Type III cement and structural steel subject to AD/CVD orders, we calculate duty liability to the dollar and advise on FTZ admission to defer or eliminate duty exposure. Our bonded warehouse holds your cargo under CBP custody — no duty paid until the material ships to job site. If your batch plant is running dry, call us: we can release a partial entry against a split shipment while the remainder stays bonded.

Operational Diagram
ORIGIN PORTISF Filed 24h Pre-LoadCBP ENTRYACE Filing · Bond CoverageBONDED WHDuty Deferral · Segregated BayEXAM / ISFVACIS · Tailgate ExamRELEASEEntry Summary FiledJOB SITELast-Mile HandoffAVG CLEARANCE18.4 HRSBOND COVERAGE$10MREV. 2026-02 · HAUL FREIGHT SYSTEMS · CUSTOMS BROKERAGE FLOW

Port Drayage

Container Pickup · Chassis Supply · Staging Yard · Transload

PIER PASS ENROLLED

Technical Parameters
ParameterSpecification
Port CoverageLA/LB · Houston · Savannah · Newark · Baltimore · Seattle
Drayage RadiusUp to 75 miles from terminal gate
Container Types20 TEU · 40 std · 40 HC · 45 HC · Open-top · Flat rack
Chassis Pool340 units · Gray pool enrolled at LA/LB · Houston
Free Time96 hrs included · Per diem rate: $75/day after
Appointment SystemGE/Advent TMS · eModal · PierPass OffPeak enrolled
Transload CapabilityContainer-to-flatbed at staging yard · Same-day
HazmatPlacard Classes 3, 8, 9 — cement additives & solvents
Dispatch Window24/7 dispatch · 2-hr gate appointment confirmation
Certifications & Compliance
TWIC CredentialedPierPass EnrolledeModal RegisteredHAZMAT Placard 3/8/9
Plain Language Summary

We pull your container before the free time clock runs. Our dray drivers are enrolled in PierPass OffPeak at LA/LB and run appointment-based gate slots to avoid terminal congestion windows. When your 40-foot high-cube arrives with rebar bundles or precast hardware, we transload to flatbed at our staging yard the same day — cutting out intermediate storage cost and keeping your delivery window intact. Chassis are always on-hand: we manage our own gray pool allocation so you're never waiting on equipment.

Operational Diagram
PORT TERMINAL20FT TEUGATE40FT HCSTAGINGYARDOR WHDRAY RADIUS75 MILESFREE TIME96 HRSCHASSIS POOL340 UNITSREV. 2026-02 · HAUL FREIGHT SYSTEMS · PORT DRAYAGE SCHEMATIC

Last-Mile Site Delivery

Just-in-Time · Crane-Ready Sequencing · Drop Zone Coordination

JIT CAPABLE

Technical Parameters
ParameterSpecification
Delivery Window±2 hrs confirmed · 4-hr pre-arrival site notice
Load SequencingCrane-ready stack order matched to pour schedule
Drop Zone Coord.Site foreman pre-brief · Designated zone marking
Vehicle TypesFlatbed · Step deck · Curtainsider · Moffett-equipped
Offload AssistIncluded — driver-operated Moffett or crane signal
Weight TicketCertified scale ticket on every load
Delivery ReceiptDigital POD with geo-stamp and timestamp
Material TypesRebar · Structural steel · Cement bags/bulk · Prefab panels
Emergency Dispatch4-hr emergency mobilization for critical pours
Certifications & Compliance
OSHA 10 DriversSite Safety BriefedMoffett CertifiedCCPD Compliant
Plain Language Summary

We deliver to active construction sites, not loading docks. Our drivers are briefed on site access restrictions, crane interference zones, and pour sequencing before dispatch. Loads are staged on the truck in reverse pour order so the first piece needed comes off first — no rehandling on site. For cement deliveries, we confirm batch plant status before departure and hold if the plant signals a delay, eliminating dead-time waiting on the slab. Every delivery closes with a digital POD, geo-stamped and time-logged, transmitted to your project management system within 30 minutes of offload.

Operational Diagram
JOB SITE BOUNDARYSTRUCTUREUNDER CONSTRUCTIONDROP ZONE ARebar · SteelDROP ZONE BCement · AggregateDELIVERY WINDOW±2 HRSSITE COORD. NOTICE4 HRS PREOFFLOAD ASSISTINCLUDEDREV. 2026-02 · HAUL FREIGHT SYSTEMS · LAST-MILE SITE DELIVERY

Cross-Border Documentation

USMCA · AES Filing · AD/CVD Compliance · Mexican Pedimento

USMCA CERTIFIED

Technical Parameters
ParameterSpecification
Trade AgreementUSMCA/T-MEC · Chapter 28 (Inorganic Chemicals) · Chapter 72 (Iron/Steel)
Export FilingAES EEI via ACE — all shipments >$2,500 or license required
Mexico DocsPedimento Aduanal · CFDI factura · NOM compliance cert
Canada DocsB3 Entry · CBSA Release · CUSMA CoO · CERS filing
AD/CVD ScopeRebar (A-570-745) · Steel wire rod · Cement (case-by-case)
CoO PreparationUSMCA Certificate of Origin — producer/exporter/importer
PhytosanitaryUSDA APHIS PPQ 577 for wood dunnage and pallets
Turn TimeFull doc package: 48 hrs · Emergency: 24 hrs (surcharge)
Carrier ComplianceC-TPAT · CTPAT-MX · PIP (Canada) enrolled carriers only
Certifications & Compliance
USMCA CertifiedAES AuthorizedC-TPAT Tier 3CTPAT-MXPIP Canada
Plain Language Summary

Cross-border shipments of structural steel and rebar require exact scope analysis against active AD/CVD orders before the truck rolls. We pull the Federal Register scope ruling for your specific product — country of origin, HTS code, physical specification — and calculate the cash deposit rate before you commit to the purchase order. For Mexico-bound cement and prefab, we prepare the full pedimento package, coordinate with your Mexican customs agent on the receiver's RFC, and confirm NOM certification numbers are current. Nothing crosses the line with an open compliance question.

Operational Diagram
UNITED STATESCANADAMEXICOBORDERNAFTA/USMCA CoOCommercial InvoicePacking ListBill of LadingISF / AES FilingPhytosanitary Cert.AD/CVD DisclosureTORONTO · MONTREALMONTERREY · CDMXREV. 2026-02 · HAUL FREIGHT SYSTEMS · CROSS-BORDER DOCUMENTATION

Put Numbers to Your Shipment

Two paths. Download the full Freight Spec Guide for your material category, or get a tonnage quote with your actual parameters. Both take under 60 seconds.

DOC-001
Download the Freight Spec Guide
PDF · 42 PAGES
Weight limits by trailer type and state corridor
Customs entry types by material and HTS chapter
AD/CVD scope matrix for steel and cement
Port drayage fee schedule and free-time calculator
Cross-border doc checklist (US/CA/MX)

No spam. Unsubscribe anytime. Guide delivered instantly.

DOC-002
Get a Tonnage Quote
RESPONSE < 4 HRS
All-in rate: drayage + customs + last-mile
Transit window with confirmed delivery date
Permit cost estimate for OD loads
Duty liability calculation (if applicable)
Assigned account rep — direct line, not a queue

Account rep responds within 4 business hours with all-in rate.

SOC 2 Type IIFMCSA RegisteredCBP LicensedC-TPAT Tier 3

Questions? ops@haulfreight.com·+1 (800) 429-4285